See our amazing Roof Lifting System. This 1650m2 (54 x 30m) section of roof was fully assembled and roofed on the ground. 4 Cranes lifted the assembled structure in just under 2 hours.

Once the roof section is fully assembled on the ground, we lift the roof using multiple cranes. This removes the need for installers to work at height while installing the structure.


This installation process is conducted by an accredited and highly experienced third-party installation company. We work with numerous third-party subcontractors who erect steel sheds full time throughout Australia. 

Our recommended installers can work directly with you.

They will:

  • Mark out the site.
  • Cast the hold-down bolts into the peers.
  • Stand the structure.
  • Clad the shed.
  • Install everything we supply including mezzanine floors, roller doors, crane rails, insulation, windows and more. 

If you want a project managed solution, we can work directly with the installer to organise your shed erection. Contact us today.